Steel detailing and design assist that prevents field problems
Almost every expensive steel surprise was visible in the drawings weeks before it reached the job site. Detailing is where those surprises get caught, and it is worth doing properly.
Shop and erection drawings
We produce shop drawings that show every piece with the dimensions, hole locations, weld symbols, bevel preparation and finish requirements the shop needs, and erection drawings that show the field where each marked piece goes and in what order. These are checked against the structural drawings, the architectural drawings and the specifications before they are issued for review.
The checking step is where value is created. A detailer who simply transcribes the engineer's drawings produces a package that passes review and fails in the field. We look for the conditions that do not resolve, the connections that were never specified, the dimensions that conflict between disciplines and the members that will not physically go into place in the sequence shown.
Model based coordination
On projects using building information modeling we coordinate the steel model with architectural, mechanical, electrical, plumbing and fire protection models so that conflicts appear on the screen rather than during erection. A duct main routed through a brace bay is a coordination note in the model and a serious problem in the field.
Model based detailing also improves fabrication accuracy, because the shop is working from geometry that has been verified rather than interpreted.
Design assist and early budgeting
The steel package is largely determined before the construction documents are finished. Bay spacing, frame system, connection philosophy, member depth limits, coating strategy and erection access all get set during design, and they carry cost consequences that are difficult to reverse later.
We participate at that stage. Give us schematic or design development drawings and we will return budget tonnage, a price range and specific, buildable recommendations. Contractors and owners who use us this way frequently buy the same building for meaningfully less money without changing the architecture.
What this scope covers
- Structural steel shop drawings
- Erection drawings and piece marking
- Connection coordination with the engineer of record
- Anchor rod and embed layout drawings
- Model based clash detection and coordination
- Advance bills of material and mill order support
- Budget tonnage estimates during design
- Constructability and value engineering review
- Deferred submittal packages for stairs and railings
- Revision management and as built record drawings
Where it applies
- Design build and design assist delivery
- Projects with compressed schedules
- Complex geometry and exposed architectural steel
- Renovation work with field verification requirements
- Multi trade congested ceiling and brace bay conditions
- Public projects with formal submittal requirements
Details worth confirming before you buy
| Item | How we handle it |
|---|---|
| Deliverables | Shop drawings, erection drawings, advance bills, embed and anchor layouts |
| Coordination | Architectural, structural, mechanical, electrical, plumbing and fire protection |
| Design assist input | Frame system, bay spacing, connection type, member depth and coating strategy |
| Review process | Internal checking against contract documents before submittal |
| Revisions | Tracked, clouded and reissued with clear revision history |
| Timing | Typically two to four weeks from award to first submittal on commercial packages |
Requirements vary by jurisdiction, occupancy and specification. We confirm the governing criteria with your design team rather than assuming.
About steel detailing and design assist
Do you design the connections?
Connection design is the responsibility of the engineer of record unless the contract documents delegate it. Where connections are delegated we coordinate with a licensed structural engineer to produce the design and calculations. Either way, we raise unresolved conditions early rather than assuming.
Can you work with our architect's model?
Yes. We coordinate with the design team's model and share the steel model for clash review. Getting this set up at award rather than mid detailing avoids a great deal of rework.
How early is too early to involve you?
There is no too early. Schematic design is the point where our input changes the most money. Even a rough massing and structural concept is enough for us to return useful budget and constructability feedback.
Often bought together
Structural Steel Fabrication
Columns, beams, moment frames, braced frames and embeds fabricated in our Spring Valley shop and delivered in erection sequence to job sites across San Diego and Southern California.
View serviceSteel Erection
Certified erection crews, documented rigging plans and crane coordination that put the frame in the air safely and on the date your superintendent needs it.
View serviceArchitecturally Exposed Structural Steel
AESS canopies, feature frames, trusses and exposed connections fabricated to the tolerance, weld appearance and surface quality the architect actually specified.
View serviceGet steel detailing and design assist priced.
Send drawings, specifications and your bid date. Our estimators review every package personally and return a scoped written proposal.